Trelleborg DrainMtH Liner
The unique Main to House sewer lining system
Trenchless Rehabilitation system for the sealing and stabilizing of lateral connections and the lateral pipes from the main sewer to the house – based on the CIPP Lining technology.
The benefits at a glance:
- No-Dig method
- No need to enter private property
- Max. rehabilitation length: 30 m / 98 ft
- Max. line distance between access manhole and lateral junction: 150 m / 492 ft
- Connection angle: 30° – 90
- Easy to position
Highly flexible liner material
- Negotiates bends up to 90°
- Excellent mechanical properties, exceeding requirements of ASTM
- 100% steam resistant
Main pipe diameters:
- Packer Type 0 : DN 135 – DN 150 | 5″ – 6″
- Packer Type I : DN 200 – DN 225 | 8“ – 9“
- Packer Type II : DN 250 – DN 350 | 10″ – 14″
- Packer Type III: DN 400 – DN 600 | 16″ – 24″
Lateral diameter:
DN 100 – DN 200 / 4“ – 8“
Please contact us for price & availability.
Product Enquiry
Product Demo