Light years ahead! Work at light speed with the BluelightLED lateral lining-system
The pinnacle of light-curing technology for lateral and small drain pipes. Designed to empower CIPP lining professionals, this advanced system eliminates time constraints found in other methods. The unique resin exclusively cures under the “blue” wavelength, granting installers a significantly extended window between liner wet-out and curing. Once in place, the automated curing system swiftly guides the LED light head through the liner, achieving rapid resin curing – up to five times quicker than alternatives. Say goodbye to hours of waiting; now, a 50’ sewer line can be fully cured in just under 10 minutes.
ENVIRONMENTALLY SAFE
Controlled manufacturing process ensures quality and resins that are free from styrenes, odors or VOCs.
- Rehabilitate pipes 3”to 10” in diameter 3 light head options
- Touch screen interface
- Interchangeable reels
- Screen mount can be rotated and repositioned for ideal viewing
- Lightweight frame design for easy portability
- Integrated camera for easy viewing of quality and installation progress
- Cure resin 5 times faster than other methods